Skip to main content

4.4. PPM (Planned Preventive Maintenance)

PPM in the equipment record

The “PPM” tab is used to plan and monitor preventive maintenance for the selected asset. It contains two sub-tabs: “Calendar” and “Schedules.”

The “Calendar” sub-tab displays all PPM tasks scheduled for the current equipment only. The “Schedules” sub-tab lists every maintenance schedule assigned to this equipment.

Several independent schedules can be created for a single asset, including annual, semiannual, quarterly, and monthly maintenance.

Users can view and open assigned schedules, edit their tasks and parameters, add operations, or modify existing operations.